Page 1 of 2 12 LastLast
Results 1 to 10 of 11

Thread: New 42 being built

  1. #1

    Default New 42 being built

    Looking forward to taking delivery of my new 42 sometime in Oct. Here are some of the specs :

    General
    trip 350's
    full tower (3' gap between hardtop and second station platform)
    Moondust hull sides with white bottom (it's like a tan/ khaki color)
    White engines
    White pipework and tower
    White and tan cushions
    trip seats at helm
    rear facing console seat
    extended T-Top (the hardtop that is used on the second row 42's but without the second row for more shade.)
    extended loungers in bow
    Dive door
    2 swim platforms
    thru hull windlass
    genny
    a/c at helm
    chill plates for coolers
    Mitchell and Rowan boxes (2 tilt out storage doors under gunnels for ropes, cleaning supplies, trash can etc)
    Tackle storage on both sides of helm seating and in rear facing seat.

    Neat custom ideas
    Hookah dive system built into the boat. Air compressor under front seating and quick release fittings for attaching hoses by the dive door.
    special removable matching umbrella for forward table, bow shade
    mesh shelf on ceiling above console bed to store eisenglass and kites.
    Glove box with multiple charging ports for iPhones and USB devices

    Electronics. 4 Garmin screens one 19", three 15" screens, 6' open array, chirp, side scan, a/p, hailer, air horns, Garrmin meteor, 3 AMPs, 4 subs, 12 speakers. GOST GPS tracking + active alarms (infrared beams, sirens, strobe lights, cell notification)

    LED lighting underwater and in boat, electric reel outlets, remote spot, etc...
    Last edited by gr1ffin; 08-24-2014 at 10:15 AM.

  2. #2
    Join Date
    Jan 2010
    Location
    Winter Haven, FL
    Posts
    40

    Default

    Can't wait to see this one come together! Congrats!!

  3. #3

    Default

    Cool color. I have a 36 moondust color hull. There are not that many yf this color. Do yourself a favor and do plain white cushions inside. I changed cushion colors inside 3x bc I didn't like moondust trim in cushions. plain white looks nice and clean trust me.

  4. #4
    Join Date
    Jul 2012
    Location
    New Jersey
    Posts
    103

    Default

    Very nice Griffin.....you have a fantastic package put together. Now it's just sit back and wait!!! Enjoy.........Joe
    Yellowfin Yachts

  5. #5

    Default

    Any updates? Can't wait to see it come together! I know you are Excited!

  6. #6

    Default

    It is in hull finishing now and will move to rigging in early Oct. Then 2 weeks in rigging. New delivery date is around mid Oct. I did add (2) Tuna tubes -- my use will be to quickly store hooked live bait when you need to pull up some lines when changing spots or when clearing lines.

    I havent seen it yet so nothing new to report but I started buying some accessories for it (13 custom rods, gaff, bait net from Connoly, some Stellas and Int'ls for boat jewelry, mix drink bar caddy that fits in the rod holder). Can't wait!

  7. #7

    Default

    Quote Originally Posted by leeoliver View Post
    Cool color. I have a 36 moondust color hull. There are not that many yf this color. Do yourself a favor and do plain white cushions inside. I changed cushion colors inside 3x bc I didn't like moondust trim in cushions. plain white looks nice and clean trust me.
    I went with mainly white upholstery with tan inserts that have some stitching-- I think it will look cool!

  8. #8

    Default

    Any updates? Need pics!

  9. #9

    Default

    It went into rigging on Monday. I'm going down to YF next week for the first time to check-up on the build.

  10. #10

    Default

    Any updates? We need pic's!

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •